Step 3: Structural Integration
Once our piles were in place, the pool contractor came in, built the rebar cage, and tied it directly into our pile caps. Piles anchor to the soil. Caps connect to the rebar. Rebar gets encased in shotcrete. The whole thing - foundation, reinforcement, shell - is one structural system.
The shotcrete and everything after that was the pool contractor's scope. Our work ended where standard pool construction begins. The structure was sound. They took it from there.








